Polycarbonate Rooflights

Sale Grammar School Rooflight Replacement thumbnail

Sale Grammar School Rooflight Replacement

We were approached by Sale Grammar School to supply and install a variety of different rooflights for an extensive roof refurbishment project.


Wadebridge School Pyramid and Trapezoidal Em-Dome Rooflights thumbnail

Wadebridge School Pyramid and Trapezoidal Em-Dome Rooflights

The existing roof of Wadebridge School’s design, technology, art and science block had begun to fail, with leaks, discoloured rooflights and reducing daylight transmission. An extensive roof refurbishment required replacing the skylights above classrooms and hallways. The project also presented an opportunity to improve the building’s thermal performance and reduce energy bills.


West Kirby Railway Station thumbnail

West Kirby Railway Station

West Kirby railway station’s 1930s platform canopy was long overdue refurbishment. Built of concrete and timber, and featuring skylights, it had begun to leak, while spalling saw small pieces of concrete falling on the platform. Whitesales were brought in by Briggs Amasco, Network Rail’s roofing contractor, to design, manufacture and install a series of non-fragile rooflights for the 900sq m replacement roof.


Kirkby Market thumbnail

Kirkby Market

When Kirkby Market in Liverpool was transformed into a fully covered market, a watertight day lit street between the market stalls was required.


Astley Cooper School thumbnail

Astley Cooper School

When Astley Cooper School in Hemel Hempstead needed to re-waterproof its roofs during the summer holidays, there were some big challenges.


Em-Dome roof lights for Scottish Agricultural College thumbnail

Em-Dome roof lights for Scottish Agricultural College

The Scottish Agricultural College had been experiencing water ingress in the Peter Wilson Building for months.


Rooflights provide light and ventilation thumbnail

Rooflights provide light and ventilation

High levels of daylight were required to light the school sports hall changing rooms as well as good ventilation, while minimising ‘Solar-Gain’.